• About
    • Who We Are
    • Global Locations
      • Regional Offices
      • Research & Development Centers
      • Manufacturing Facilities
      • Service Centers
    • QHSE
    • Careers
  • Application Challenges
    • Downhole Artificial Lift
      • Unconventionals
      • Mature Fields
      • Low Flow Rate Production
      • Harsh Environment
      • Deviated & Small Wellbores
      • Heavy Oil
      • SAGD
      • Geothermal
      • Water Applications
    • Surface Fluid Transfer
      • Surface Injection (CO2, SWD)
      • Crude & NGL Pumps
      • Lean Amine Recirculation
      • Mine Dewatering
  • Products
    • ESP – Std Speed Systems
      • Permanent Magnet Motors
    • ESP – High-Speed Systems
    • Progressing Cavity Pumps
    • Horizontal Pump Systems
    • Downhole Sensor
    • Cable
    • Surface Control
    • Monitoring and Optimization
  • Services
    • Field Service
    • Equipment Testing & Repair
    • Run Life & Equipment Tracking
    • Production Optimization
  • Investors
    • Corporate Governance
    • Newsroom
      • Investor News
      • Press Releases and Articles
    • Key Financials
    • Financial Reports
    • Presentations and Events
    • Credit Ratings
    • Outstanding Bond Issues
    • Finance Calendar
    • Investor Relations Contact
  • Resources
    • Brochures & Case Studies
    • Catalog
    • Certifications
    • Gallery
  • Contact Us
    • Request Contact
    • Global Locations
    • Event Schedule
    • Investor Relations Contact
Careers
logo mainlogo darklogo main
  • About
    • Who We Are
    • Global Locations
      • Regional Offices
      • Research & Development Centers
      • Manufacturing Facilities
      • Service Centers
    • QHSE
    • Careers
  • Application Challenges
    • Downhole Artificial Lift
      • Unconventionals
      • Mature Fields
      • Low Flow Rate Production
      • Harsh Environment
      • Deviated & Small Wellbores
      • Heavy Oil
      • SAGD
      • Geothermal
      • Water Applications
    • Surface Fluid Transfer
      • Surface Injection (CO2, SWD)
      • Crude & NGL Pumps
      • Lean Amine Recirculation
      • Mine Dewatering
  • Products
    • ESP – Std Speed Systems
      • Permanent Magnet Motors
    • ESP – High-Speed Systems
    • Progressing Cavity Pumps
    • Horizontal Pump Systems
    • Downhole Sensor
    • Cable
    • Surface Control
    • Monitoring and Optimization
  • Services
    • Field Service
    • Equipment Testing & Repair
    • Run Life & Equipment Tracking
    • Production Optimization
  • Investors
    • Corporate Governance
    • Newsroom
      • Investor News
      • Press Releases and Articles
    • Key Financials
    • Financial Reports
    • Presentations and Events
    • Credit Ratings
    • Outstanding Bond Issues
    • Finance Calendar
    • Investor Relations Contact
  • Resources
    • Brochures & Case Studies
    • Catalog
    • Certifications
    • Gallery
  • Contact Us
    • Request Contact
    • Global Locations
    • Event Schedule
    • Investor Relations Contact
Search
logo main logo darklogo light

Image Gallery

Industry Events

EGYPS 2020. The Borets team ready to discuss key technology like Permanent Magnet Motors.
Borets at EGYPS 2020. The Borets team stands ready to greet customers and provide technical solutions for artificial lift and horizontal surface fluid transfer challenges.

Manufacturing

ESP power cable manufacturing.
ESP power cable manufacturing at ZTS-Kabel in Slovakia.
ESP stage preparation in Borets' manufacturing facility.
PCP rotor preparation.
A Borets' team member configuring equipment for stage finishing.
Borets team members assembling a pump.
The foundry casting ESP stages.
Precise configuration of the PMM manufacturing process.
The Borets team completing final assembly of a PMM.
Permanent magnet motor assembly.
WIde ranging, wear resistant stage production at Borets' Oskol plant.
Metal injection molding process.
Part of WR2 high-speed stage production.
Testing of VSD controllers.

Services

A Borets team member assembling an ESP pump in our one of our Texas service center.s
Multiple HPS unit being prepared in Colombia.
A horizontal pump system unit being prepared for load out at our Bogota, Colombia service facility.
ESP string testing at our facility in Colombia.
Permanent magnet motor (PMM) testing in our Colombia facility.
Borets 15 VSDs awaiting deployment to the field in Colombia.
The secure motor test area in our Colombia facility.
The Borets team at our facility in Alexandria, Egypt.
Horizontal pump system HPS testing at the Borets service center in Egypt.
The Borets team at work in our Egypt Service Center.
The Borets Egypt Service Center team reviewing work details.
A Borets VSD technician on location checking VSD settings.
Borets field service team on Permian basin location preparing equipment.
The field service crew on an ESP PMM installation Texas.
Setting up the Axiom II VSD on a newly installed PMM-ESP system in Texas.
  • Brochures and Case Studies
  • Catalog
  • Certifications
  • Gallery

Borets International Headquarters
Office 22, Level 15
The Gate Building
Dubai International Financial Centre
P.O. Box 121208
Dubai, United Arab Emirates
e-mail: global@borets.com

Useful Links

QHSE

HR/Careers

Permanent Magnet Motors

Unconventionals

HPS

Sawafi JV

Investors

Contact Investor Relations

Press Releases & Articles

Resources

© 2021 Borets, all rights reserved.                                            Site Map               Disclaimer

Our location

Lorem ipsum dolor sit amet, consectetur elit. Quisque quis quam ipsum

m

Sunset Bogota, BXY 92101

251 Purple Sunset Bogota

+ (123) 134 – 789

+ (123) 234 – 567

stal1@qodeinteractive

stal2@qodeinteractive

  • Brochures and Case Studies
  • Catalog
  • Certifications
  • Gallery